Skip to main content

Rundown Clock

Event driven show timing from Excel or Google Sheets.

Overview​

The Rundown Clock drives your show from a structured event list with elapsed, countdown, and time of day displays. Import your rundown from Excel or Google Sheets, and the clock automatically tracks current and next events, firing triggers on transitions.

Column Headers​

Your rundown spreadsheet needs specific column headers in the first row. The Rundown Clock reads these headers by name, so the spelling must match exactly.

Column HeaderRequiredWhat it does
Event NameYesThe name of the event, shown on clock displays and passed to triggers.
Event TimeYesWhen the event starts. Accepts DateTime, TimeSpan, or a time string in your system's date format.
Event CommentNoA description or notes for the event. Passed to triggers alongside the name.
Event TagNoA category label for the event. Google Sheets rundowns read the cell background colour from this column for visual colour coding on the clock displays.
Hint: Event Tag Colour Coding

Event Tag colour coding only works with Google Sheets rundowns, where the Rundown Clock reads the actual cell background colour from the spreadsheet. In Excel rundowns the Event Tag text is still read, but the colour information is not available.

Setting Up an Excel Rundown​

  1. Create an Excel file (.xlsx) with the column headers above in the first row.
  2. Add one event per row with times in your system's date format.
  3. Add an 'Excel Rundown' device in Central Control.
  4. Set the 'File Path' parameter to your .xlsx file.
  5. Enable the device. Events load immediately and poll for changes every 10 seconds.

Setting Up a Google Sheets Rundown​

  1. Create a Google Sheet with the same column headers.
  2. Set the sheet's visibility to 'Unlisted' with 'Anyone with the link' access.
  3. Obtain a Google Sheets API Key from Google Cloud Console.
  4. Add a 'Google Sheets Rundown' device in Central Control.
  5. Set 'API Key' to your Google Sheets API key.
  6. Set 'Spreadsheet URL' to the Google Sheet URL.
  7. Enable the device. The sheet is read and polled for updates.

Clock Displays​

The Rundown Clock provides four frame source outputs that can be routed to monitors, Stream Decks, or WebPanel Pro displays:

OutputColourShows
ElapsedGreenTime since current event started
CountdownRedTime until next event
Time Of DayCyanCurrent time (HH:MM:SS)
Dual ClocksGreen + RedElapsed and countdown side by side

Commands & Triggers​

Rundown Clock commands

CommandDescription
Manual GoAdvance to next event manually
Manual BackReturn to previous event
Pause AutomationEnter manual tracking mode (no auto advance)
Back To AutomationReturn to automatic event tracking

Rundown Clock triggers

TriggerParametersDescription
Event StartedEvent Name, Event CommentFires when a new event becomes current
Event FinishedEvent Name, Event CommentFires when leaving an event
Hint: Automated Show Flow

Combine a Google Sheets Rundown with trigger conditions for each event. Your producer updates the rundown in Google Sheets, and Central Control automatically fires the right commands when each segment starts - camera presets, graphics, audio adjustments - all hands free.